KAFD Basements – Leakage Investigation and Condition Assessment
VCME completed a comprehensive leakage investigation and condition assessment across multiple basement parcels at King Abdullah Financial District (KAFD) in Riyadh, Saudi Arabia. The assessment covered Parcel 4.07/4.08, 2.05, 2.09, 4.03, 4.11, and 5.03 and combined visual inspections, field testing, water sampling, moisture analysis, chloride and sulfate testing, impact ehco/pulse velocity testing, and ground penetrating radar (GPR) measurements to evaluate water ingress and related deterioration.
Dubai Wharf – PTI Trial
This project was a Post Tension Impregnation (PTI) trial at Dubai Wharf. The scope focused on two selected post-tension tendons in slab B2, including mobilization, GPR tendon location, IE/PV, borescope inspection, port installation, air leak testing, impregnation works, cleanup, and reporting.
Azure Tower Basement B3
This project involved a corrosion and leakage condition assessment for Azure Tower (B3 + G + 29) on Reem Island, Abu Dhabi. The scope focused on Basement B3, where VCMES carried out visual inspection and NDT to evaluate leakage, corrosion risk, and concrete durability, and to define remedial recommendations.