Dubai Wharf – PTI Trial
This project was a Post Tension Impregnation (PTI) trial at Dubai Wharf. The scope focused on two selected post-tension tendons in slab B2, including mobilization, GPR tendon location, IE/PV, borescope inspection, port installation, air leak testing, impregnation works, cleanup, and reporting.